Day 13 - prb11 - Bay job 2 - Central heating pipe work installation | Options Skills
Home » Testimonials » Day 13 – prb11 – Bay job 2 – Central heating pipe work installation

Day 13 – prb11 – Bay job 2 – Central heating pipe work installation

Day 13 begins with group prb11 working on central heating and pipe work installation. Including, hanging of radiators as you can see from the images. Trainees will be given the knowledge that the normal position for installing the radiators is under the windows then placed on a side wall. Precise measures are taken into hand when practically working on hanging radiators.

All data correct at time of publication.