Day 15 – Final Part of Bay Job 2 – Installation of 10mm pipework to radiator valves
Day 15 involves installation of 10mm pipework to radiator valves. This is the final part of the bay job 2 and must be completed in order to gain the qualification Logic Foundation Cert in Basic Heating & Hot Water Systems, Design & Specification.
Tag:plumbing