Day 15 - Final Part of Bay Job 2 - Installation of 10mm pipework to radiator valves | Options Skills
Home » Testimonials » Day 15 – Final Part of Bay Job 2 – Installation of 10mm pipework to radiator valves

Day 15 – Final Part of Bay Job 2 – Installation of 10mm pipework to radiator valves

Day 15 involves installation of 10mm pipework to radiator valves.  This is the final part of the bay job 2 and must be completed in order to gain the qualification  Logic Foundation Cert in Basic Heating & Hot Water Systems, Design & Specification.


All data correct at time of publication.